Location:
North Herefordshire
Client:
S&M Edwards & Sons

Project Overview

A fully insulated cold-store building for bulk potato storage, this building presented its own challenges due to a high voltage overhead cable running alongside. Power was fed into the grid from a temporary generator to enable a formal shutdown of the overhead supply by the utility provider, but the limited timescale for this arrangement dictated completion of the building shell in a 3 week window.